Gateshead Energy Centre

This contract had undergone extensive value engineering by the client throughout the Tender/Contract stage. Ultimately we manufactured and erected a 116 Tonne project for Balfour Beatty.

 

Extensive design changes put a lot of pressure on our design team to turn this project around in the time frame given.

 

The project is now fully functional and powers some of the more prolific buildings on the Gateshead Quayside.